T: 01847 831120 E: info@gowgroundworks.co.uk

Services

“One-stop shop”

This best describes our approach whereby we can if required take care of the complete package for the client. This may include identifying and/or acquiring ground, handling design and planning processes, negotiating with sub-contractors, neighbours etc and means the client only has to deal with Alan Gow himself as the personal contact within the company.

Contract Size

Alan Gow Groundworks is well able to handle a variety of contracts, ranging from 1-day employee hire to monthly machine hire, all at extremely competitive rates, and contracts up to 100k have been completed.

Plant and Equipment

Seven years on, the company can deploy a full range of modern heavy and light plant, including tracked excavators from 1- 13 tonnes, forward tipping dumpers from 1-6 tonnes, walk-behind and sit-on vibrating rollers, walk-behind and sit-on screed power floats, JCB Loadall and JCB3CX, and road roller. Externally-calibrated site measuring and levelling equipment are standard tools of our trade. Our small yet comprehensive transport fleet comprises vans, tippers, trailers and pickups and has serviced operations over a wide geographical area. All Alan Gow Groundworks plant and vehicles are, wherever possible, serviced locally, either by local engineers or at the company’s own service yard.

Specialist Work

  • Concrete-Highly-polished or brushed, small to massive pours, pumping if required-examples are Scrabster harbour extension, D Steven yard, wind turbine bases at Wathegar
  • Groundworks-Foundations up to DPC level for kit or traditional build
  • Drainage-small to complex drainage systems for foul, land and water installations
  • Road-Moling-work for Local authorities and Utilities
  • Streetscapes-Drystone walling, block and paver drives
  • Steelwork-all types of steelwork installation-agricultural, transport garages constructed
  • Design & Build-home extensions and sewage systems
  • Agricultural-steel-frame construction, silage pits
  • Flooring-Flagstone flooring laid, including underfloor heating installation if required
  • Tidal works-concrete and steelwork installation

Recent Projects

Parcel Force, Inverness

Gow Groundworks was sub-contracted by Kingsway Contractors to carry out drainage and resurfacing works at Parcel Force, Inverness.  

New House Site, Killin

Gow Groundworks completed drainage, foundation and concrete floor in Killin for a new house    

Resurfacing, Raigmore Hospital

Gow Groundworks was sub-contracted by Kier Construction to carry out resurfacing works at the entrance to Raigmore Hospital, Inverness.

Mast downtakings, Scotland

Gow Groundworks was sub-contracted by Balfour Beatty to take down telephone masts across Scotland and reinstate the area.  They carried More…

Helipad Raigmore Hospital

Gow Groundworks was sub-contracted by Kier Construction to construct a new helipad at Raigmore Hospital, Inverness.  This was a challenge More…

Dunnet Bay Distillery

Gow Groundworks were sub-contracted by Compass Building & Construction Services to carry out demolition works at Dunnet Bay Distillery.

Holm Fish Pass

Operated Plant hire with various attachments on a tricky site for McGregor Construction.

New Mortuary Edinburgh

Gow Groundworks carried out all internal drainage, alterations to existing building, extension to car parks and landscaping works for a More…

Cardross, Co-op

Gow Groundworks carried out all the demolition works and foundations for a new Co-op store in Cardross for Dickie & More…

Scrabster Ice Plant

In 2017, Alan Gow Groundworks was awarded the contract for carrying out all civil works for a containerised ice generating More…

Latheron Junction

Gow Groundworks were contracted to widen Latheron Junction on A99 to allow the delivery of wind turbines for Wathegar 2 More…

Stroupster Wind Farm

This contract was carried out in 2014 for RJ McLeod Ltd.  Gow Groundworks completed all concrete works for the 12 More…

Stronelairg Wind Farm

Gow Groundworks are currently on hire to RJ McLeod at Stronelairg Wind Farm. Plant on hire: Volvo EW160E with tilt More…

Road Re-alignment, Croy

Gow Groundworks carried out road re-alignment works at Croy.  This consisted of bulk earth works, formation, verging and re-instatement works. More…

Coop, Pitlochry

  Gow Groundworks were subcontracted by Dickie & Moore to stabilise the existing structures and banks of the Moulin Burn. More…

Watten Play Park

We carried out all groundworks for the pre-erection of the play equipment for SutCliffe Play Scotland in Watten village, Caithness. More…